Thermal Instrumentation and Analysis of 5000t/d Cement Clinker Production Line |
XIONG Zhi-ming1,2,HUANG Bo3,DING Xiang-ping3 |
1. Hunan Institute of Metrology and Test, Changsha, Hunan 410014, Ching;
2. National Quality Supervision and Inspection Center of coal, oil and natural gas analysis instruments, Changsha, Hunan 410014, China
3. Hunan Building Materials Research and Design Institute Ltd, Changsha, Hunan 410011, China |
|
|
Abstract Through analyzing the measured data of LYNF 5000 t / d cement production line, the line has a practical clinker output of 5587 t / d. The heat consumption of sintering system is 3166.8 kJ/kg. The first stage outlet has got a slightly higher temperature at 321 ℃. The C1 separating efficiency is 92.81%, which can be significantly improved. The poor cooling effect of grate cooler results in the low-quality & high temperature clinker and the heat recovery efficiency isn't ideal. The production potential is great by analyzing the measured data. The heat consumption, electricity consumption and clinker output are saved after production system is improved.
|
|
|
|
|
|
[1]国家质量监督检验检疫总局. GB/T26282-2010 水泥回转窑热平衡测定方法[S]. 2010.
[2]国家质量监督检验检疫总局. GB/T26281- 2010 水泥回转窑热平衡、热效率、综合能耗计算方法[S]. 2010.
[3]严峻, 叶越华. 江西上高南方4500t/d预分解窑系统的热工标定与分析[J].江西建材,2011,(4):15-17.
[4]赵登彦, 齐砚勇, 邓国亮. 四川JG2500t/d生产线热工标定与降耗分析[J]. 水泥生产, 2015,(1):1.
[5]国家质量监督检验检疫总局. GB 50295-2008 水泥工厂设计规范 [S]. 2008.
[6]樊少杰, 任洪波, 李金柱, 等. 5000 t/d第三代篦冷机技术改造[J]. 水泥工程, 2014, (5):40-42.
[7]考宏涛, 陈慧, 丁颂亚, 等. 10000t/d预分解窑系统的热工分析[J]. 水泥, 2010, (8):21-23. |
|
|
|