Abstract:To solve the problem of uncertainty evaluation for IIR filter calculation in line with GUM, a state-space representation for the filter is used. As a result the output of the filter depends only on the current input and the current state-space vector, the dependence on past inputs and past outputs, which causes unable to evaluation uncertainty under GUM framework, is absorbed in the state-space vector, and the uncertainty calculation formula is given. The proposed method applies iterative computation and thus can be realized in an easy way, and also enables real-time applications. The proposed procedure is illustrated by simulation, for instance, a noise-corrupted signal and a IIR filter with coefficients are uncertain.
[1]BIPM, IEC, IFCC,et al.Guide to the Expression of Uncertainty in Measurement. International Organization for Standardization, Guide to the Expression of Uncertainty in Measurement[S].Geneva:International Organization for Standardization, 2008.
[2]费业泰. 误差理论与数据处理[M]. 北京:机械工业出版社,2015.
[3]倪育才.实用测量不确定度评定[M].北京:中国计量出版社,2004.
[4]黄俊钦.测试系统动力学及应用[M].北京:国防工业出版社,2013.
[5]Hessling J P. A novel method of dynamic correction in the time domain[J]. Meas Sci Technol, 2008,19(7):184-187.
[6]Elster C,Link A,bruns T.Analysis of dynamic measurements and determination of time-dependent measurement uncertainty using a second-order model[J]. Meas Sci Technol, 2007,18(12):3682-3687.
[7]Elster C, Link A. Analysis of dynamic measurements: compensation of dynamic error and evaluation of uncertainty[C]//Pavese F, Bar M, Forbes A B, et al. Advanced Mathematical and Computational Tools in Metrology and Testing. World Scientific Publishing Company, 2009: 80-89.
[8]胡红波,孙桥.二阶线性时不变测量系统动态特性的补偿与动态不确定度评估[J]. 计量学报,2013,34(2):106-110.
[9]Eichstadt S, Hessling P, Link A, et al. Comparison of two methods for dynamic uncertainty calculation[C]//Analysis of Dynamic Measurements, National Physical Laboratory, Teddington,2008.
[10]Wegener M,Schnieder E. Application of GUM method for state-space systems in the case of uncorrelated input uncertainties[J]. Meas Sci Technol, 2013,24(2):827-837.
[11]Eichstadt S, Arendachka B, Link A, et al. Evaluation of measurement uncertainty for time-dependent quantities[C]//16th International Congress of Metrology, EPJ Web of Conferences 77, 2014,00003,1-8.
[12]Link A, Elster C. Uncertainty evaluation for IIR (infinite impulse response) filtering using a state-space approach[J]. Measurement Science and Technology, 2009, 20(5), 055104.
[13]谢克明,李国勇.现代控制理论[M].北京:清华大学出版社,2010.